Operations
Supporting
your Success
We are committed to keeping our community informed and minimizing disruptions while ensuring our facilities remain safe, efficient, and fully functional. From tenant relations support to securing meeting spaces and coordinating logistics, we’re here to help make your big projects run smoothly. Whether you need assistance with day-to-day needs or special arrangements, our team is dedicated to providing seamless support every step of the way, ensuring your experience at the UA Tech Park is efficient and hassle-free.
Operational
Advisories
Stay informed with operations updates impacting buildings and shared spaces across the UA Tech Park. These updates include scheduled maintenance, emergency shutdowns and public service advisories which may temporarily affect access to certain areas or services.
Window Washing Monday December, 15 - Friday December 19
Please be advised that window washing will occur on the exterior of buildings 9020,
9022, 9030, 9032, 9040, 9042, 9052, 9062, 9070, and 9072 from Monday, December 15th through Friday, December 19th.
For safety reasons, we kindly ask that Occupants:
- Be aware of your surroundings and follow safety protocols.
- Avoid the areas where window cleaning is in progress.
- Traffic control will be implemented to guide you.
- Do not enter restricted zones. Unauthorized personnel are prohibited in
these areas.
Questions or Concerns?
If you have any questions about this work, please don’t hesitate to contact Marjorie Rinaldo at OccupantServices@uastp.com.
Stay Informed:
For the latest updates on operational advisories, please visit our website at www.uastp.com.
Thank you for your cooperation.
Asphalt Repair | 11/29/2025 - 12/08/2025
Please be advised:
Weather permitting, Saturday, November 29, through December 8 Contract Operator, Jacobs CO, will be performing asphalt maintenance on Science Park Drive along the Kolb Road Entrance, on the Roadway to Building 9016, in parking Lot 6, and the drive east of Lot 5.
During this time, the parking Lots and Drives indicated must be blocked off according to the following schedule:
- Science Park Drive along the Kolb Road Entrance – November 29and 30 – A detour will be in place around the work area.
- 9016 Drive – November 30 – The drive will be closed, December 1 – Areas will be blocked off until painting is complete.
- Southeast part of Lot 6 – Closed December 1stto December 4th.
- The drive east of Lot 5 – Closed December 2ndand December 3rd.
- 9016 Drive (Weather Back up to November 30) – December 7 – The drive will be closed, December 8 – Areas will be blocked off until painting is complete.
Parts of Lot 6 will remain open for parking.
Please see the maps attached for details.
Asphalt maintenance requires favorable weather conditions for applications to set properly. The listed date may have to be adjusted to accommodate weather conditions.
Parking in non-paved areas is not permitted. Please adhere to all “No Parking” posts and signs. Site Security will be patrolling and enforcing compliance in these restricted areas. Occupants should plan their work schedules, routes, and alternate parking locations accordingly.
Please be mindful of workers and equipment in the area and observe any area blocked off with signs, cones, or barricades.
If you have any questions, please do not hesitate to contact Marjorie Rinaldo at OccupantServices@uastp.com. In addition, please visit www.uastp.com to stay informed on recent operations advisory announcements.
Thank you.
9020 Roof Recoat Project | 11/6/2025 - 12/12/2025
Please be advised:
Beginning the morning of November 6, 2025, through approximately December 12, 2025, contractors will be performing roof cleaning & recoating of building 9020. There will be service vehicles moving and parking along the north side of the building throughout the duration of the project. Be mindful of workers and equipment in the area and observe any areas that are blocked off with signs, cones, or barricades.
Please see the attached map for details.
If you have any questions, please contact Joe Turner Joseph.Turner2@jacobs.com or Dave Brown dbrown@uatechpark.org.
Construction
Permitting Process
Whether you’re planning new construction, modifying a space, or utilizing common areas, the UA Tech Park team is here to help you navigate with confidence. Our streamlined approach ensures compliance while minimizing delays – so you can stay focused on innovation, not paperwork.
Tech Parks Arizona streamlines the development process by serving as its own permitting authority. This internal permitting capability allows for faster turnaround times, greater flexibility, and a more efficient path from design to construction—ensuring that projects can move at the speed of business.
key Campus
Contacts
From construction coordination to tenant relations and everything in between, the UA Tech Park team is here to ensure your needs are met—quickly, efficiently, and with care.
Tenant Relations
We’re here to support your success—whether you need help navigating park resources, booking the event center, or bringing community activities to the park. Reach out and let us know how we can assist.
Facilities & Maintenance Support
Our maintenance team is just a call or click away—ready to assist with repairs, upkeep, and ensuring your workspace stays safe, functional and efficient.
Construction & Onsite Projects
Connect with us and we’ll guide you through the process from start to finish to ensure your project runs smoothly and meets all UA Tech Park requirements.